Tools
Draw Sizer
A phased development budget, distributed into a monthly draw schedule. Each line gets a start month, a duration, and a shape. The schedule, the S-curve, and the category rollups follow from those three inputs.
Demonstration tool. Not a commitment to lend and not financial advice.
Phase timeline
Shift a whole phase with its own control on each row — each phase keeps its own offset.Sensitivity
0 assumes every line moves independently, which makes the band far too tight. Real cost and schedule risk move together. Set each phase's worst-case slip on its row in the timeline above.
Budget
Columns
Pick a preset in the Shape and Risk columns, or hit Tune▾ in either to open the exact steepness, timing, and range controls. Filters affect this view only — the schedule, chart, and export always use the full budget.
| Phase | Category | Line item | Amount | Shape | Start | Months | Risk | Curve | Check |
|---|
No line items. Load the sample or add a line.
Contingency
%